Fehler melden.
Accepted file types: jpg, jpeg, gif, png, Max. file size: 512 MB.
- eine Kopie wird an diese Email versendet.
This field is for validation purposes and should be left unchanged.
Cart There are 0 product(s) in your cart
Request a Quote
Request a quote

Enter your repair costs and compare

If a car/truck hit a bollard, the following repair cost are to be expected

Please edit, if need be, the values in the orange fields.
Hourly wage
 €
Vehicle costs per hour
 €
Poller ohne 3p Poller mit 3p
Without 3p-Technology
1Wage and Vehicle costs (hourly rates)
Hours spent
 Hrs
5 Min.
Wage and Vehicle cost
x  €
x  €
2Material costs
New 3P Junction piece
-
35.00 €
Bollard
 €
-
Foundation/Ground shell
 €
-
Surroundings
 €
-
Other Costs
(Roadblocks, detour, excavator rent...)
 €
-
Material costs
x  €
35.00  €
3Total savings
Without 3p-Technology
Wage and Vehicle cost
x €
x €
Material costs
x €
35.00 €
Total costs
x  €
x
Savings with 3p-Technology up to x €/Bollard
Note: The values above count for each case of damaged Bollard. The savings can sum up to several thousand Euro per year. The "long-term" maintenance costs are borne by the commune alone.
reset
Just ask for a Presentation!

We would be pleased to visit you and to demonstrate the function and the advantages of the 3p technology on site using an Original system.

Set a meeting
Live video consultation

Get to know our products and clarify technical questions quickly and easily in a video call with us!

make an appointment
PERSONAL ADVICE
ABES S. à r. l.

Parc d’Activité Syrdall
48, rue Gabriel Lippmann
L-6947 Niederanven

FON +352.28 67 65 01
FAX +352.28 67 65 20

shop@abes-online.com